Work list Shipyard Varadero Caribe, Cumana Venezuela
6 months on the hard......
we will do a major steelwork job here.....

- bigger fuel tanks with new steel 6mm tops and
..new return lines, total fuel now 7300 liters.
- new water tanks build of wood-epoxy
- all new copper water plumbing through ship
- hull totally ultra sounded and approx 6  square  meters of hull plating replaced.   
Hull plating is now all over 5.8 mm to 6.0   mm. Like new!
CLICK to SEE the new ultrasound
results of Varadero Caribe 2002

- overhauled chain locker, new steel
- new galley in salon, see picture below
- 2 new double cabins forward of salon, picture !!.
- engine room and black tank painted
- all bilges painted
- hull below waterline new paint and antifouling
- new fridge and freezer, ISOTHERM dualcompr.
- wings completely treated and painted
- 5 new breather pipes for the diesel, water and   luboil tanks.
- 4 new drainpipes to deck level
- new plumbing for blackwater
- interior varnish and paint