The first time that we sandblast the outside hull below the waterline to SA 2.5 and than paint the bottom with a proper 2-component epoxy system of International.
We spray paint the topsides again in the controversial light april green color that will last until sept 2002. (Than again white white)
Rebuild aft cabin to one double berth and 2 singles
As well we replace 50% of the standing rigging and have the rest checked out. The second half of all standing rigging got replaced in 1999 by the same rigger Jonas of Trinidad Rigging.
Of course we did another million things in that year
in Crews-Inn Boatyard, Chagaramas,Trinidad &T, DWI.